01 From size to exhibition floor

Lead times and delivery

We would rather lose the order than miss your exhibition date. Here is what the calendar actually looks like, counted in working days from the moment you approve the proof.

An illuminated wall standing on an exhibition floor beside transport cases before openingILLUSTRATIVE · PRODUCTION PREPARATION
02From approval to the hall
  1. Day 0

    You approve the proof

    Nothing is produced before this. The clock starts here, not at the order.

  2. Days 1-3

    Print and cut

    Dye-sublimation onto B1 fabric, silicone edge sewn on, frame cut to your dimensions.

  3. Days 4-20

    Consolidation and transit

    The long leg. This is where an ocean shipment differs from an air shipment.

  4. Days 21-25

    Customs and inbound

    Import clearance into the EU, then onward to you or to the venue.

  5. Day 25-35

    It arrives

    To your address, or to the exhibition floor at your stand number.

03Options
01

Standard

25-35 working days. The default. Quoted on every order.

02

Rush

10-14 working days. Air freight, subject to confirmation and additional cost. We confirm feasibility before you commit.

03

Rental

Usually inside 10 working days. Frame from stock, fabric printed for you. The route that most often saves a tight date.

04

Floor delivery

Add 140 EUR. Delivered to the hall on your build-up day, to your stand number.

STANDARD LEAD TIME2535

Working days after artwork approval.

POSSIBLE RUSH1014

Working days, subject to confirmation and extra cost.

What we will not do

We do not confirm a date we are not confident of. If your exhibition is too close for a purchase, we will say so and quote the rental instead, even though it is the smaller order.

Compare rental
No contact form required

Send me the full price list

Every size, both buy and rent prices, artwork tiers and add-ons. One email, no call.

One email with the price list. No newsletter unless you ask for one. Privacy statement